Więcej informacji z niemieckiego forum
https://www.motor-talk.de/forum/ruec...-t6241050.html
Cytat:
1. The engine is first checked for coolant loss (pressure test) and oil loss (especially at the cylinder head in the turbocharger area (behind the wind deflector).
2. If oil loss is detected in the above range, the cylinder head should / should be changed.
3. The air intake (air filter box and pipes to the rear left) and the battery box must go out, because on the battery box (left outside) a new cable distributor is mounted and
4. underneath a plug connection is disconnected and the new wiring harness is inserted.
5. The alternator has to go out, because most of them have to replace the coolant thermostat (82 degrees).
6. The coolant tank and a few hoses are changed.
7. The engine coolant bypass valve is replaced.
8. A coolant standpipe is newly installed (right behind the coolant tank (see photo)) and connected to the new wiring harness / hoses.
9. The engine control module (PCM), body control module (BCM) and instrument cluster (IPC) receive a software update.
|